财经纵横新浪首页 > 财经纵横 > 滚动新闻 > 部委专题--商务部 > 正文
 

中国宁波市水管理项目


http://finance.sina.com.cn 2005年07月04日 18:10 商务部网站

  项目编号: GJZB_NO.4544项目名称: 宁波市水管理项目国 家: 中国类 属: 咨询服务资金支持: 世界银行摘要:咨询服务贷款/信贷号码:合同/投标号码:发布日期: 2005-07-04截止日期:2005-07-11项目介绍:ThePeople抯 Republic of China has applied for aproject pretion grantfor the proposed GEF Ningbo-Cixi WetlandProject and intends toapply part of the grant proceeds to makepayments under thefollowing contracts:Contract 1: Ningbo-Cixiwetland project naturalwetland study. The tive of study is: (i)i
dentification of awetland conservation area west of theNingbo-Shanghai Bridge,including any necessary land improvements;(ii) conceptual designfor an Environmental Education and ResearchCenter in thedesignated wetland area, including cost estimates; and(iii)formulation of a TOR for a more comprehensiveenvironmentalmanagement plan study for the whole Cixi coastline tobe fundedunder the GEF projectContract 2: Ningbo-Cixi wetlandprojectconstructed wetland study. The tive of study is: the firstphase ofthe study will clearly define the tive of the constructedwetlandprogram and prepare alternative constructed wetland designswithoutconsidering land requirements. The second phase of the studywillconsider land-related issues and arrive at thepreferredconfiguration of wetland design and land use. The outputfrom thestudy will be a feasibility level study to enable theCixiMunicipal Wastewater Company and Cixi City Government toclearlydefine the detailed designs, construction andoperation/maintenancestages along with associated costs.The NingboWater and EnvironmentProject Management Office (NWEPMO) now invitesdomestic consultantsto indicate their interest in providing theservices. Interestedconsultants must provide detailed informationindicating that theyare qualified to perform the services,especially the experiencewith natural wetland and constructedwetland to treat effluentsfrom secondary biological treatmentplants or other wastewaters, aswell as experience in Hangzhou Bayfor Contract 1 (brochures,detion of similar assignments, experiencein similar conditions,availability of appropriate skills amongstaff, etc.).Consultantswill be selected in accordance with theprocedures set out in theWorld Bank抯 Guidelines: Selection andEmployment of Consultants byWorld Bank Borrower, May 2004, theselection will be based ontheConsultants?Qualification(CQS).Expected consultant assignmentswillstart from July 2005 and the duration is expected to beeightmonths.Interested consultants may obtain further informationat theaddress below from 0830 to 1130 hours and from 1400 to 1800hours,Monday to Friday.EOI should be received by NEWPMO at theaddressbelow not later than 1130 hours (Beijing time) on 11July2005.Contact:Ningbo Water and Environment ProjectManagementOffice.Attn: Ms. Xu Xu or Mr. Lizhibo.1510/R, 15/F,TianningTower.138 West Zhongshan Rd.Ningbo, 315000 ZhejiangProvince,China.Tel: (86-574) 8728-0409, 8718-6862.Fax:(86-574)8728-0430.E-mail: xx@nbdpc.gov.cn;mailto:zhibo@nbnet.com.cn.Website: http://xx@nbdpc.gov.cn;zhibo@nbnet.com.cnNoticeNumber:WB1925-658/05

  (信息来源:承包劳务频道子站)

  文章类型:



谈股论金】【收藏此页】【股票时时看】【 】【多种方式看新闻】【打印】【关闭
新 闻 查 询
关键词


新浪网财经纵横网友意见留言板 电话:010-82628888-5174   欢迎批评指正

新浪简介 | About Sina | 广告服务 | 联系我们 | 招聘信息 | 网站律师 | SINA English | 会员注册 | 产品答疑

Copyright © 1996 - 2005 SINA Inc. All Rights Reserved

版权所有 新浪网

北京市通信公司提供网络带宽