基础设施 | Infrastructures | | | | | | | | 2003.8.8 |
序号 | 项目名称 | 行业 | 建设规模及内容 | 总投资 (万美元) | 利用外资额(万美元) | 承办单位 | 联系人 | 电话 (区号0596) | 前期工作深度 |
No. | Project name | Trade type | Construction sclae & content | Total investment (×USD$10000) | Foreign investment(×USD$10000) | Undertaker | Contact | Tel: 86-596- | Project progress |
1 | 20万吨级矿石中转码头工程 | 交通 | 年吞吐量2000万吨,20万吨级铁矿石卸船泊位一个和3万吨级铁矿石装船泊位二个 | 20485 | 1807 | 古雷办
| 王汉清 | 3112336 | 完成预可研 |
| 200000 ton-grade ore transfer berth | transportation | yearly throughput 20 million tons; to build 1berthfor ore unloading, and 2 berths for ore loading | 20485 | 1807 | Zhangzhou Gulei Port Economic RegionConstructionOffice | Mr. Wang Hanqing | 3112336 | pre-feasibility research reports made |
2 | 2万吨级多用途码头工程 | 交通 | 建设重力式结构码头长200米,宽40米,2万吨级多用途泊位 | 2289 | 1100 | 古雷办 | 王汉清 | 3112336 | 完成预可研 |
| 20000 ton-grade berth for multiple use | transportation | to build a 20000 ton-grade berth ofmassiveconstruction, 200m long and 40m wide | 2289 | 1100 | Zhangzhou Gulei Port Economic RegionConstructionOffice | Mr. Wang Hanqing | 3112336 | pre-feasibility research reports made |
3 | 3.5万吨级散杂货码头 | 交通 | 建设3.5万吨散杂货泊位1个,设计年吞吐量80万吨 | 3012 | 2500 | 古雷办 | 王汉清 | 3112336 | 完成预可研 |
| 35000 ton-grade berth forbulkcargo | transportation | to build a 35000 ton-grade berth for bulkcargo,designed yearly throughput 0.8 million tons | 3012 | 2500 | Zhangzhou Gulei Port Economic RegionConstructionOffice | Mr. Wang Hanqing | 3112336 | pre-feasibility research reports made |
4 | 诏安赤石湾一级渔港工程 | 交通 | 建防波堤1620 m,码头8个泊位、驳、护岸410 m,营造陆地8.4万m2。 | 370 | 300 | 诏安县赤石湾一级渔港建设开发有限公司 | 黄平光 | 3562032 | 已立项、 |
| A-class fishing port of Chishi Bay, ZhaoanCounty | Transportation | To build seawall of 1620ms long, 8 berths,bulkwalland retaining wall 410ms, land construction 84000sqm | 370 | 300 | Chishi Bay Fishing Port Construction Co.,ZhaoanCounty | Mr. Huang Pingguang | 3562032 | item made |
5 | 诏安县梅岭赭角5000吨多用途码头 | 交通 | 建设一个5000吨级多用途码头,年吞吐量35万吨。 | 870 | 600 | 诏安县港口建设公司 | 李建华 | 3564014 | 已立项、 |
| Meiling Zhejiao berth of Zhaoan County | Transportation | A berth of 5000 ton-grade for multiple use;yearlythroughput 350000 tons | 870 | 600 | Zhaoan County Harbor Construction Co. | Mr. Li Jianhua | 3564014 | item made |
6 | 东山县1.5吨级多用途码头 | 交通 | 2个泊位码头,年吞吐量70万吨 | 1687 | 1500 | 东山县港务局 | 沈慧彬 | 5681664 | 列入港口建设规划,疏港公路在配套中 |
| Chengan 15000 ton-grade berth for multipleuse,Dongshan County | Transportation | To build 2 berths, yearly throughput 700000tons | 1687 | 1500 | Dongshan County Harbor Affairs Bureau | Shen Huibin | 5620343 | Planned, harbor road underconstruction |
7 | 漳浦县古雷深水港区系列码头开发 | 交通 | 可供建设5千至10万吨级泊位码头20个,工业区内有:精尖石油化工后加工产业,钢铁深加工产品,玻璃纤维系列产品,相关下游加工产业,服务业及资源加工业 | 面议 | 面议 | 漳浦县古雷办 | 王汉清 | 3112336 | 完成港区港口规划,地质钻探,地形水文测量,港区总体发展规划完成编制,完成各种码头预可,3.5万吨码头已经国家计委批准立项目 |
| Series of berths construction at the deep-waterharborarea of Gulei, Zhangpu County | Transportation | available for 20 berths of 5000-100000ton-grade; inthe region industries as petro-chemical processing,steel and irondeep-processing, fibreglass series products, relateddownstreamindustry, service industry and resource processingindustry | to be negotiated | to be negotiated | Zhangzhou Gulei Port Economic RegionConstructionOffice | Mr. Wang Hanqing | 3112336 | harbor plan made, geologicdrillingdone, topographic survery andhydrographicsurvey done, prefeasibility research reports made, the35000ton-grade berth project made |
8 | 漳浦县六鳌港五千吨级多用途码头 | 交通 | 兴建壹座长127M五千吨级泊位,集建材,杂货为一体的多用途码头,年吞吐能力30吨 | 500 | 450 | 漳浦县六鳌镇经联委经济开发公司 | 何晓明 | 5732889 | 完成可研并已立项 |
| 5000 ton-grade berth of multiple-use, LiuaoHarbor,Zhangpu County | Transportation | One 5000 ton-grade berth of 127ms long, formultipleuse, yearly circulation 30000 tons | 500 | 450 | Economic Cooperation Committee of LiuaoTown,ZhangpuCounty | Mr. He Xiaoming | 5732889 | Feasibility research done, Projectmade |
9 | 东山县西埔至铜本公路改扩建工程 | 交通 | 长9.1km,路基50m,水泥路面24.5m | 554 | 450 | 东山县路桥建设发展总公司 | 李粒生 | 5836199 | 省计委批准立项 |
| Road expansion of Xipu-Tongben, DongshanCounty | Transportation | 9.1 km long, roadbed 50m, cement roadsurface24.5m | 554 | 450 | Roads and Bridges Construction DevelopmentCo.,Dongshan County | Mr. Li Lisheng | 5836199 | project made by ProvincialPlanningCommittee |
10 | 东山县西埔至宫前公路改造工程 | 交通 | 长16.33km,宽16m,水泥路面9m | 301 | 250 | 陈城镇政府 | 朱叶顺 | 5788998 | 已规划 |
| Reconstruction of Xipu-Gongqian Road,DongshanCounty | Transportation | 16.33 km long, 16m wide, cement road surface9m | 301 | 250 | ChenCheng Town Government, Dongshan County | Mr. Zhu Yeshun | 5788998 | planned |
11 | 诏安县闽粤边界开发区第二通道 | 交通 | 开发道路900 m、商住楼,总开发用地面积57亩。 | 600 | 500 | 诏安县闽粤边界贸易加工区管委会 | 李南泽 | 3302808 | 已规划 |
| Second thoroughfare of Fujian-GuangdongBorderDevelopment Zone, Zhaoan County | Transportation | road development 900m, residntial buildings,land area57 mus | 600 | 500 | Administration Committee of Fujian-GuangdongBorderDevelopment Zone, Zhaoan County | mr. Li Nanze | 3302808 | planned |
12 | 古雷港口经济区风力发电场 | 能源 | 总装机规模:98台171.5MW总发电量:5.170亿kWh/年总可售电量:4.860亿kWh/年 | 面议 | 面议 | 古雷办 | 王汉清 | 3112336 | 完成预可研 |
| Wind power station of Gulei HarborEconomicRegion | Energy | Installed capacity 98 sets, 171.5 MW,yearlyelectricity generation 517 million kwh, 486 millionkwhsalable | to be negotiated | to be negotiated | Zhangzhou Gulei Port Economic RegionConstructionOffice | Mr. Wang Hanqing | 3112336 | pre-feasibility research reports made |
13 | 漳浦县六鳌风力发电场 | 能源 | 安装单机容量1.75MW风力发电机98台,年发电5.17亿千瓦时 | 15500 | 15000 | 漳浦县六鳌镇经济开发有限公司 | 何晓明 | 3732076 | 完成预可研 |
| Zhangpu Liuao wind power station | Energy | Installed capacity 98 sets of 1.75MWgenerators,yearly 517million kwh | 15500 | 15000 | Liuao Town Economic Development Co., Ltd.,ZhangpuCounty | Mr. He Xiaoming | 3732076 | Pre-feasibility made |
14 | 长泰县枋洋水利枢纽工程 | 能源 | 总库容10877m3总装机容量1.2万千瓦,年发电4200万千瓦时,日平均供66.53万m3主要建设上存大坝,枋洋电站,溪口闸坝溪口河床式电站,引水隧洞 | 7530 | 7000 | 长泰县枋洋水利枢纽工程投资经营公司 | 戴振文 | 1.3807E+10 | 完成项目建议书 |
| Banyang Reservoir of Changtai County | Energy | Water reservation 108.84 million cubicmetres,installed capacity 12000 kw, yearly generating electricity42million kwh, to build dam, Bangyang power station, Xikoupowerstation, tunnels | 7530 | 7000 | Bangyang Hydro-junction Investment &ManagementCo. | Mr. Dai Zhenwen | 1.3807E+10 | item suggestion made |
15 | 甘竹电站一级三级开发 | 能源 | 可装机1800千瓦,年发电量680万度 | 200 | 200 | 和平乡政府 | 方成江 | 8768268 | 完成项目建议书 |
| Ganzhu power station development | Energy | installed capacity 1800 kw, yearly electricity6.8million kwh | 200 | 200 | Heping Township Government | Mr. Fang Chengjiang | 8768268 | item suggestion made |
16 | 船场吊钟水电站 | 能源 | 装机总量2800千瓦的两级水电站 | 196 | 196 | 船场镇经济发展办公室 | 徐仁强 | 7741072 | 已完成可行性研究报告 |
| Diaozhong power station, Chuanchang Town | Energy | installed capacity 2800kw | 196 | 196 | Eonomic Development Office of Chuanchang Town,NanjingCounty | Mr. Xu Renqiang | 7741072 | feasibility research done |
17 | 船场树海青格营水电站 | 能源 | 装机容量2000千瓦 | 170 | 170 | 船场镇经济发展办公室 | 徐仁强 | 7741072 | 已完成可行性研究报告 |
| Shuhaiqinggeying Power Station, ChuanchangTown | Energy | installed capacity 2000kw | 170 | 170 | Eonomic Development Office of Chuanchang Town,NanjingCounty | Mr. Xu Renqiang | 7741072 | feasibility research done |
18 | 南靖象溪流域水资源综合利用 | 能源 | 1、装机总容量7600千瓦的三级水电站;2、H迈进止只有7万吨的自来水厂 | 860 | 700 | 山城镇人民政府 | 游林园 | 7822028 | 已完成可行性研究报告 |
| Water resource comprehensive development ofXiangxiRiver area, Nanjing County | Energy | installed capacity 7600 kw,a water plant of70000 tonswater supply per day | 860 | 700 | Shancheng Town Government, Nanjing County | Mr. You Linyuan | 7822028 | feasibility research done |
19 | 云霄县生活垃圾无害化处理场 | 环保 | 占地68亩,设计能力为日处理垃圾150吨 | 700 | 600 | 云霄县建设局 | 方海赐 | 8531247 | 可研报告及初设已批准 |
| Garbage innocuously treatment plant ofYunxiaoCounty | environment protection | Land occupation 68 mus, daily treatment 150tons | 700 | 600 | Yunxiao County Construction Bureau | Mr. Fan Haici | 8531247 | Feasibility research report and priliminarydesignapproved |
20 | 招商局漳州开发区污水处理厂 | 环保 | 近期建设规模4万吨/日 | 759 | 313 | 漳州开发区招商水务有限公司 | 张一峰 | 6852266 | 已批可研 |
| Sewage plant of China Merchants ZhangzhouDevelopmentZone | environment protection | first phase 40000 tons | 759 | 313 | Water Affairs Co., Ltd.of China MerchantsZhangzhouDevelopment Zone | Mr.Zhang Yifeng | 6852266 | Feasibility research report approved |
21 | 东山污水处理厂项目 | 环保 | 总投资1100万美元,日处理污水10万吨,前期投资300万美元,日处理污水2万吨 | 1100 | 1100 | 东山经济技术开发区 | 沈茂欣 | 5885019 | 该项目已经省计委批准立项,本项目可研已编制完成 |
| Dongshan sewage treatment plant | environment protection | total investment USD$11million, daily treatment100000tons of sewage water; first phase investment USD$3 million,dailytreatment 20000 tons of sewage water | 1100 | 1100 | Dongshan Economic & TechnologyDevelopmentZone | Mr. Shen Maoxin | 5885019 | Project made, feasibility researchreportmade |
22 | 工业污水处理厂 | 环保 | 1、总规划面积60亩,地款480万元;2、日处理工业污水4万吨,设备及相关配套设施1000万元;3、建筑物投入960万元。 | 300 | 200 | 漳浦县绥安工业区开发总公司 | 黄东辉 | 3200563 | 该项目已选址、并办好《土地使用证》 |
| Sewage treatment plant of Suian IndustrialDevelopmentZone, Zhangpu County | environment protection | planned area 60 mus, land price RMB¥4.8 million;dailytreatment 40000 tons of sewage water, equipments andaccessoriesRMB¥10 million; buildings RMB¥9.6 million | 300 | 200 | Suian Industrial Development Zone Co.,ZhangpuCounty | Mr. Huang Donghui | 3200563 | Site selected, land user certificategot |
23 | 漳浦县污水处理厂 | 环保 | 总体规模为4万M3/d,近期按2万M3/d,辅助建筑2300M2 | 588 | 500 | 漳浦县建设局 | 黄伟民 | 3107149 | 选址已确定,预可行性研究已完成 |
| Zhangpu County Sewage Plant | environment protection | total scale 40000 m3/d, first phase 20000m3/d,auxiliary buildings 2300m2 | 588 | 500 | Zhangpu County Construction Bureau | Mr. Huang Weimin | 3107149 | Site selected, pre-feasibility researchdone |
24 | 诏安县城市污水处理工程 | 环保 | 建远期日处理污水6万m3,首期日处理污水2万m3。 | 600 | 500 | 诏安县建设局 | 沈茂松 | 3324200 | 已立项、 |
| Zhaoan County municipal sewage plant | environment protection | total scale 60000 M3/d, first phase20000M3/d | 600 | 500 | Zhaoan County Construction Bureau | Mr. Shen Maosong | 3324200 | project made |
25 | 长泰兴泰开发区污水处理厂项目 | 环保 | 设计日处理污水5万吨 | 800 | 600 | 长泰县兴泰开发区 | 戴泰德 佘金松 | 8318058 | 已编项目建议书 |
| Sewage plant of Xingtai Development Zone,ChangtaiCounty | environment protection | Daily treatment 50000 tons of swage water | 800 | 600 | Xingtai Development Zone, Changtai County | Mr. Dai Taide, Mr. She Jingsong | 8318058 | project suggestion made |
26 | 漳浦县城市生活垃圾处理场 | 环保 | 设计规模100—150吨/日,占地145亩,采用卫生填埋与堆肥综合处理工艺,主要建设垃圾填埋库区,渗滤液处理站,堆制肥车间,菌种培养系统综合管理楼 | 322 | 采用BOT建设运营 | 漳浦县建设局 | 黄维民 | 3101666 | 完成项目可研报告 |
| Zhangpu municipal garbage innocuouslytreatmentplant | environment protection | Planned scale 100-150 tons daily, land 145 mus,bylandfill, to build landfill area, seeping fluid treatmentcenter,auxiliary management center | 322 | by BOT | Zhangpu County Construction Bureau | Mr. Huang Weimin | 3101666 | feasibility research report made |
27 | 东山县垃圾无害化处理场 | 环保 | 日处理垃圾200吨 | 625 | 625 | 东山县环卫处 | 刘顺德 | 5830594 | 批项目建议书,可研修订报批 |
| Garbage innocuously treatment plantofDongshanCounty | environment protection | Daily treatment 200 tons of garbage | 625 | 625 | Dongshan County Environment protectionOffice | Mr. Liu Shunde | 5830594 | project suggestion approved, feasibilityresearchreport to be approved |
28 | 东山开发区垃圾处理厂 | 环保 | 日处理垃圾800吨,首期投资200万美元,日处理30吨 | 500 | 500 | 东山经济技术开发区 | 林群龙 | 5885294 | 该项目已经省计委批准立项,项目用地手续已批准 |
| Garbage treatment plant of DongshanDevelopmentZone | environment protection | Daily treatment 800 tons; first phase investmentUSD$2million, daily treatment 30 tons | 500 | 500 | Dongshan Economic & TechnologyDevelopmentZone | Mr. Lin Qunlong | 5885294 | project made by provincial planning committee;landuse approved |
29 | 诏安县城市垃圾无害化处理工程 | 环保 | 建设日处理生活垃圾120吨。 | 420 | 350 | 诏安县建设局 | 沈茂松 | 3324200 | 已立项 |
| Zhaoan municipal garbage innocuouslytreatmentplant | environment protection | daily treatment 120 tons | 420 | 350 | Zhaoan County Construction Bureau | Mr. Shen Maosong | 3324200 | project made |
30 | 诏安县梅岭半岛及大埕湾供水工程 | 供水 | 建输水两线管道总长38km,加压站2座,调节高位水池3座。 | 360 | 300 | 诏安县自来水公司 | 沈超雄 | 3564014 | 已立项 |
| Water supply plant of Meiling Peninsula andDachengBay, Zhaoan County | water supply | water pipes 38 km long, 2 pump stations, 3 waterleveladjusting pools | 360 | 300 | Zhaoan County Water Supply Co. | Mr. Shen Caoxiong | 3564014 | project made |
31 | 东山县向东渠引蓄水改扩建工程 | 供水 | 渡槽改造4352米,明渠必暗渠2670米,必隧洞1500米,红旗水库加固,灌溉支渠 | 1283 | 680 | 东山县水务局 | 许炳林 | 5839199 | 已编可研 |
| Expansion of water storage and draw watertoXiangdong Canal, Dongshan County | water supply | wateraqueduct reconstruction4352m, open ditch to underdrain 2670 m, tunnels1500m, reinforcement overHongqi Reservoir, branch ditches | 1283 | 680 | Dongshan County Water Affairs Bureau | Mr. Xu Binglin | 5839199 | feasibility research done |
32 | 古农农场自来水公司 | 供水 | 日供水量壹万吨 | 200 | 200 | 古农农场银塘工业区 | 林自勇 | 8332563 | 原农场自来水厂整厂转让、扩建 |
| Water Supply Co. ofGulongFarm | water supply | daily providing water 10000 tons | 200 | 200 | Yintang Industrial Park of Gulong Farm,ChangtaiCounty | Mr. Lin Zhiyong | 8332563 | ownership transfer of the present water supplyplant,expansion |