项目编号: GJZB_NO.4330项目名称: 电力传输项目国 家: 阿塞拜疆类 属: 资源及能源贷款总额:(单位:百万美元)发布日期: 2005-5-25工程类别:项目介绍:进展阶段:Negotiationscompleted.详细介绍:The project aims atestablishing an efficient andfinancially viable power transmissionsystem by creating a centraldispatch facility with energymanagement capability andrehabilitating the existing powertransmission grid. Negotiationscompleted. Environmental AssessmentCategory: EnvironmentalAssessme
nt Category B. PID: 83341. US$ US$40.0 (IBRD). Consultantswill be required Azerenerji JSC10,Academician Abdul Kerim AliZadeh st, Baku, AZ 1005, Azerbaijan,Contact: Mr. Teyyar Ibrahimov,Project Director Tel: (994-12)984-184 Fax: (994-12) 985-523E-mail: teyyar@azernerji.com
(信息来源:承包劳务频道子站)
|